Delivering Demolition Excellence for a Half Century

01909 515 580

Soft Strip


Metals and Plant has a wealth of experience in interior soft strip, strip out and enabling works, associated with the safe and environmentally sound preparation of buildings prior to commercial redevelopment or refurbishment. Soft stripping is a common term used when preparing a structure for demolition or reuse. Essentially, all fixtures and fittings, for example, doors, windows, bathrooms, kitchens, floor coverings etc are all removed from the building, leaving nothing but the steel or concrete frame.

Over the decades Metals and Plant have carried out projects in many different environments, all requiring detailed planning to minimize the effect of the works on companies employees, residents, patients and the general public. Having worked in live Hospitals, Universities, Schools and Large Shopping Centres to name a few, we can come up with a solution to minimize on interaction with the public and ensuring that all dust and debris from the work does not contaminate surrounding areas. We will work the hours that suits any particular situation and if restrictions are in place (ie: noisy works or transportation of waste) we will work with you to ensure the project is carried out safely, with minimal disruption. Working alongside major developers, planning consultants and main contractors, Metals and Plant Ltd offers a quality strip out service, providing a comprehensive solution.

The Environmental sustainability of waste is taken very seriously at Metals and Plant. In accordance with good environmental practice and in line with current legislation, construction waste is segregated and recycled, whilst hazardous materials are disposed of under controlled conditions. Site-specific Waste Management Plans (SWMP) are prepared, providing detailed documentation for disposal of construction waste on major projects.

What We Cover

Some of our Soft Strip and De-Construction Services are as follows

furniture & fittings Removal

including cupboards, storage, kitchens and toilets etc..

Concrete slab & screed removal

Including cutting, sawing and drilling

Lift & lift shaft equipment

Alterations, dismantling and removal

Floor Covering Removal

Including carpets, tiles, lino, parquet flooring and wooden floor boards etc..

Doors, frames, ironmongery Removal

Including internal and external

Wall removal

Including stud, partition, brick block and load bearing walls

Suspended ceilings removal

Including wall linings, coverings and finishes

Heating & ventilation removal

Including associated decommissioning and purging of the systems

Basement equipment Removal

Including fuel storage tanks, boilers, flues and generators etc...

Data & Electrical Services Removal

Including all isolations and necessary paperwork

Confined space works

Basements and risers etc...

Glazing Removal

Including internal and external with associated frame work

Robotic demolition
Material segregation

Maximise recycling potential of all waste streams with full documentation and closure reports

Hazardous waste disposal

Including CCF refrigerant, transformer PCBs, fluorescent and sodium tubes, UPS batteries

Asbestos removal

Including surveying, reporting and disposal

Project Management

Preparation and implementation of health and safety plans and CDM regulations

Whats Included

Here we have a brief breakdown of the individual items which collectively enable Metals and Plant Ltd to offer such a safe high class service.

1
Site Visit

A Comprehensive and professional site audit will be undertaken to allow all necessary site specific documentation to be produced.

2
Environmental Assessment

A comprehensive assessment will be undertaken to highlight any potential environmental issues in line with works envisaged to be undertaken.

3
COSHH

A detailed task specific COSHH assessment will be undertaken to enable us to highlight any potential asbestos, substances, fumes that might cause a potential hazard.

4
Contract Lifting Assessment

If lifting operations are required to complete the work safely, a comprehensive survey will be undertaken to then allow a detailed lifting plan to be formulated in line with all current legislation.

5
Risk Assessments

A detailed task and site specific risk assessment will be completed to allow the works to be undertaken safely.

6
Quotation

A detailed and competitive quotation will be produced with all potential assets from the works being offset to enable the client to receive the lowest possible quote.

7
Method Statement

A detailed task and site specific method statement will be completed with all current safe working procedures implemented.

8
Highways Agency

We will deal with all necessary correspondence with relevant government agencies in relation to possible road closures / permits to complete the work safely and legally.

9
Insurances

Proof of Metals and Plant's full comprehensive insurance cover will be presented to the client before work commences.

10
Project Management

The works will be undertaken by highly trained Metals and Plant Ltd personnel who will oversee the contract through to its safe and environmentally friendly completion.

11
Waste Stream Documentation

All relevant documentation in regards to monitoring the waste streams produced from our site activities will be recorded and presented to the client for their SWMP.

Additional Information

Here are some of our latest projects and recent testimonials.

Northern General Hospital

This contract involved the mechanical strip out and soft furnishing strip out of the Vickers ward at the live Northern general Hospital. Great care had to be taken throughout our works as other live services supplying various important pieces of equipment around the hospital were logistically close to works being undertaken by Metals and Plant Ltd...

Mechanical Strip out

Henry Whipple School

Henry Whipple School went through a dramatic transformation with numerous of Metals and Plants specialised services coming into play. The School required a partial demolition with localised areas of the redundant building initially requiring concrete sawing to separate it from the live School and in turn allow a safe demolition...

Demolition - Dismantling - Structural Alterations - Soft Strip out - Mechanical Strip out - Asbestos Removal

City Plaza

This live city centre six storey building was occupied from the first floor to the sixth by numerous organisations including a busy solicitor's office. A brief scope of works was for the ground floor of the building (including the reception area), internal courtyard and rear two storey office block to receive a full soft furnishing strip out, partial mechanical and electrical strip out leaving vital M&E services feeding the tenants, structural alterations forming numerous new doorways and removing countless structural walls (including fitting associated steels) to open up the ground floor...

Demolition - Dismantling - Structural Alterations - Soft Strip out - Mechanical Strip out

Leeds University Lab Testing Facility

Metals and Plant Ltd were commissioned to undertake the full decommissioning and mechanical strip out of the former testing laboratory at Leeds University. This was a complex project requiring particular attention to detail for numerous reasons, the main ones being live services running alongside the redundant equipment to be removed...

Demolition - Dismantling - Structural Alterations - Soft Strip out - Mechanical Strip out - Tank Decommissioning

HSE Testing Facility

Demolition - Dismantling - Structural Alterations - Soft Strip out - Mechanical Strip out - Contract Lift - Tank Decommissioning

Government Social Welfare Centre

Demolition - Dismantling - Structural Alterations - Soft Strip out - Mechanical Strip out - Asbestos Removal

La Senza & Officers Club, Meadowhall

Due to exceptional workmanship, continuing to deliver each project ahead of schedule and most importantly delivering each project incident free. Metals and Plant Ltd was asked to undertake two large contracts collectively at Meadowhall shopping centre...

Soft Strip out - Dismantling - Structural Alterations - Mechanical Strip out

Staircase Removal

Removal of an indoor bespoke three storey steel constructed staircase and associated landings from a cardboard factory in Wakefield. Obvious safety issues were falls from height, fire hazards and respiratory issues due to the potential build up of fumes...

Dismantling

Goldsmiths Meadowhall

Another complex and potentially dangerous contract safely and methodically undertaken by Metals and Plant Ltd. Not only was all work completed as always without incident, but the contract was finished a full week ahead of schedule, much to the delight of the principle contractor...

Soft Strip Out - Structural Alterations - Dismantling - Mechanical Strip Out - Asbestos Removal

Worsley building, Leeds University

Difficult contract working on the 12th floor of the Worsley building at Leeds University. Over two miles of 4, 6 and 8 inch insulated steel pipework at high level was processed and removed. Working around countless hazardous waste ducting, associated live electrical/mechanical services feeding the live 12 storey university building...

Mechanical Strip out - Asbestos Removal

Millhouse Public House

The careful dismantling and partial demolition of a 17th century listed building at the Millhouse public house in Worksop. Over time parts of the listed buildings roof had fallen in, which had left the stone gable ends and remaining roof structure in disrepair and in an unstable condition...

Demolition - Dismantling

Nandos Meadowhall

This extensive contract consisted of the full soft furnishing strip out, mechanical strip out and partial demolition of Nandos Meadowhall. This included the associated mezzanine floor/office area, kitchen, dining area, two large walk in freezers, dumbwaiter lift and extensive 16m x 4m shop front glazing...

Soft Strip Out - Mechanical Strip Out - Demolition - Dismantling

Unit Refurbishment

This contract consisted of the isolation and removal of redundant service, removal of internal mezzanine floor, removal of office/toilet area and removal of a large concrete access ramp. The extensive asbestos cladding on two elevations was then safely and legally removed to reveal the steel framework of the building...

Asbestos Removal - Mechanical Strip Out - Soft Strip out - Tank Removal - Dismantling - Demolition

Lidl Super Store

Recent contract fitting a structural needling system to allow a 20m external load bearing wall to be removed from a live Lidl in Hull. This job was trickier than normal as the internal slab was deemed not able to withstand the loads presented from the roof once the wall was removed, so the needling system was cantilevered from fabricated steels positioned on the foundation ring beam...

Structural Alterations - Demolition

Dockside Super Cranes

Metals and Plant were employed to dismantle then arrange the shipping of 2nr 1000 tonne Dockside container handling cranes from the Port of Tokyo in Japan to Bristol Port. In brief the ship was fitted with bespoke rails along both the port and starboard side and a bespoke folding rail extension support system to the stern...

Dismantling - Transporting - Erecting

Sheffield Steel Works

Metals and Plant were commissioned to undertake the decommissioning, demolition, dismantling and site clearance of the largest Steel works in Yorkshire, Tinsley Park Works, with over 25,000 tonnes of steel scrap being processed then removed from this 360 acre site...

Demolition - Dismantling

Kingston Hospital

Mechanical strip out of a roof level plant room at Kingston hospital, London. The work consisted of removing 2 x large braithwaite water tanks , 2 x small galvanized water tanks with associated pipe work, air handling unit and associated ductwork all with specialized cold cutting methods...

Mechanical Strip Out

Residential Home

Removal of two redundant boilers from a residential home in York with the use of oxygen/propane cutting equipment. Principle contractor Kier were happy with the work as it was carried out safely and professionally as always...

Boiler Removal - Asbestos Removal

Charles F Stead

Another safe dismantling job undertaken by Metals and Plant Ltd. This redundant coal silo was removed from the live site during normal working hours at C.F.Stead Ltd, Leeds.

Tank Removal - Contract Lift

Peglers Yorkshire

Dismantling and removal of redundant machinery from Peglers Yorkshire, Doncaster. The work was carried out at peak times on the live site without affecting production as requested.

Machine Removal - Mechanical Strip Out - Contract Lift

Doncaster Royal Infirmary

Today's removal of various processed machinery from the roof of Doncaster Royal Infirmary, which was completed under strict contract lift conditions . This also involved the partial closure of the main car park at entrance 1A...

Contract Lift - Mechanical Strip Out

Forgemasters Bridge

Last nights road closure, traffic managment and removal of redundant pipe bridge from over Brightside lane at Sheffield Forgemasters. Finished ahead of schedule and most of all safely.

Dismantling - Contract Lift

River Rother Stone Bridges

Metals and Plant was contracted to remove two 100 year old stone constructed bridges that spanned the live railway line and the River Rother at Beighton, Sheffield. This included painting and prepping the underside of the bridges to allow them to receive a stress test by the client and see what maximum load they could ultimately take before being demolished...

Demolition - Dismantling

Residential Asbestos Garage

The safe and legal dismantling, removal and disposal of asbestos clad garage from a residential property in Sheffield.

Asbestos Removal

Testimonials

Metals and Plant Ltd have recently undertaken a demolition scheme for PTL, this was the first time PTL had worked with Metals and Plant, I would certainly recommend them for any future work, as they pulled out all the stops to complete the work in a set tight timescale and carried out their work in a professional manner.

During my employment at Pegler Yorkshire Group Ltd (Doncaster Site) between 2009 & 2015 I used Metals & Plant Ltd for all my major demolition & removal projects. Danny Macpherson (Managing Director) was always very professional and practical at looking at challenging projects we worked together on...

Read Full Testimonial
Wates
Seba uk
Carillion
Sheffield Forge Masters
NHS
MOD
ISG
Kier
Finnegans
M3
British Rail
Pegler Yorkshire